Duct takeoffs + 3D shop drawings. Built around your shop.
Tell us about the job. We set up a call, go over the drawings and your shop standards, and agree on scope and timing before any work starts.
Thanks. Got it.
This is a preview, so nothing was sent. On ductvision.com this sends your note and we reply by email to set up a call.
Real output from a real job


| Sheet metal 22 + 24 ga | 891 lb |
| Straight duct | 141 LF |
| Liner / wrap | 281 / 438 sf |
| Fittings | 49 |
| Shop pieces | 27 |
| Flex | 34 LF |




Swipe for more →
What a job needs
Good output starts with a complete set. Here's what we ask for once we've talked.
Missing something? Say so on the form. Gaps come back as questions, never guesses.
Tap for the details
1What's in the takeoff?
- Sheet metal weight by gauge, from the actual pieces
- Straight duct LF by size
- Liner and wrap square footage, read from the spec
- Every fitting, diffuser, grille, damper and flex run counted
- Buy-out list (bought elbows, flex, devices)
- Delivered in Excel or formatted for ProEst, FastEST, Trimble, Accubid or whatever you bid in
2What's in the shop drawings?
- Duct plans with sizes and bottom-of-duct elevations
- Numbered piece marks and a piece schedule with cut lengths
- Fittings, dampers, access doors and devices
- Sections where space is tight
- Your shop's standard notes
- AutoCAD, Revit, IFC, FreeCAD or PDF
3Which shop standards do you follow?
Yours. Send them over, or we'll walk through them on the call. Anything missing gets flagged as a question, never guessed.
| Standard | Example |
|---|---|
| Min gauge | 24 ga |
| Gauge breaks | ≤30" 24 · ≤54" 22 · ≤84" 20 |
| Joints | TDC all rect |
| Sections | S&D 59" · TDC 56" |
| Liner | 1", clear inside |
| Exposed duct | Full liner, no wrap |
| Splits | Radius-throat bullhead tee |
| Drops | Bought 90°, flex ≤ 5'-0" |
4How fast?
It depends on the size of the job and how complete the set is. Smaller jobs can come back in as little as 24 hours. We agree on a firm date on the call, before anything starts. More on expedited shop drawings and expedited takeoffs.
5How is it priced?
Per job, based on the size and what you need. You get a fixed price after we've talked and seen the set, and revision rounds are agreed up front.
6Point clouds and site scanning
Have a point cloud? Mention it on the form. Routing duct through it and flagging conflicts is quoted per job.
Need a scan? On-site LiDAR scanning in the NYC area is coming soon. Mention it on the form to get on the list.
7Do you do BIM coordination?
No. You get duct models and shop drawings in AutoCAD, Revit or IFC, ready for your BIM team to drop into the federated model. No cross-trade clash coordination and no coordination meetings.
8Who does the work?
A sheet metal estimator with years in the field, the shop and the estimating office, working with AI. The AI reads, traces and models. Every job gets checked against your rules and reviewed by a person before it goes out.
9Are my drawings kept private?
Yes. Drawings are kept private and used only for your job.
10How is a duct takeoff figured?
Surface area of each run and fitting, times the gauge weight, plus seams and joints.
weight = sqft × lb/sqft for the gauge × (1 + seam allowance)
Example: 24×12, 20 ft, 24 ga = 6.0 sqft/ft × 20 = 120 sqft × 1.156 = 138.7 lb, +15% seams = 159.5 lb.
| Gauge | Galv. lb/sqft |
|---|---|
| 26 | 0.906 |
| 24 | 1.156 |
| 22 | 1.406 |
| 20 | 1.656 |
| 18 | 2.156 |
Fittings are figured from their own surface area, not as extra footage. Lined duct is usually sized clear inside, so the metal grows by twice the liner. Exposed duct often gets full liner and no wrap. The spec decides.